Files
searchi/fixtures/relevance-v2/sources/meter-b.md
T

255 B

Annual radiator inspection

Rowan Court schedules radiator inspections every November. A technician checks valves for leaks and trapped air. Residents arrange access between 09:00 and 15:00. The maintenance log records repairs, not electricity billing.