4 lines
255 B
Markdown
4 lines
255 B
Markdown
# Annual radiator inspection
|
|
|
|
Rowan Court schedules radiator inspections every November. A technician checks valves for leaks and trapped air. Residents arrange access between 09:00 and 15:00. The maintenance log records repairs, not electricity billing.
|